Exemption from the General Plan of the City of Grosseto for upgrading sports ell'area located in Braccagni
territorial framework and state of
The sports area is located in Braccagni outside the village, in the triangle formed by the Via Aurelia and the road south of the Provincial Bozzone, with an overlooking open countryside.
The soccer field is behind a compact residential fabric, developed along the road, and is accessed by the transom via Piancani corner of the new headquarters of the Bank of Maremma. From here you can branch off two roads: one leads to the locker room and the secretary and the other leading to the stands.
The size of the center is about 22,029 square meters and will include: a regular football field to eleven, a hard court tennis (disused) an ice rink (no longer used), two storage buildings, with changing rooms and secretariats (one closed), and a grandstand.
Today the real areas where the activities are carried out are limited, because these are only the main field and one of the buildings used for storage and changing rooms. All other areas were neglected because of their non-use.
is to be noted that the municipal administration of Grosseto has planned three-year plan of public works, added to the list of actions to be implemented in 2010, the execution of the roof of a skating rink for an amount of 300 000 Euro and maintenance changing rooms overlooking, thereby enabling the redevelopment of the area located west of the complex.
The need for action shared by the community
During the drafting of the Regulations of the Urban Municipality of Grosseto has been undertaken, by 'Administration, a phase of listening and participation of citizens in the villages. They gathered in their constituencies bring to light issues as individuals and in the proportion of the membership about the lack of space or lack of public green or sc Arsita infrastructure.
In Braccagni, specifically, among other issues emerged:
"A square : several years indicate that many citizens from a planning point of view one of the most important things to Braccagni missing is a reference center, a public meeting.
A square, a meeting place for young and old newspaper, a public space in which to develop social relationships. As such, the square should be a place surrounded by commercial and residential buildings, to become a real center of attraction and area representative of the community. "
" An area of \u200b\u200bgreen spaces: the far down is reported the need to create a garden or an area of \u200b\u200bpublic green facilities for the elderly and children. "
REPORT downloaded from the Grosseto:: FORUM BRACCAGNI and Montepescali December 17, 2008
The lack of quality standards and public gathering spaces in our cities, is due More and more social problems related to low relationship between individuals, the lack of communication, to sterility and lack of integration of social relationships.
In Braccagni as a major part, which has about 1482 inhabitants, the need to carve gathering places is as evident as necessary.
The only spaces for the community are the gardens inside the country and those close to the church, but do not create a true urban center of cultural exchange.
The philosophy of the proposed intervention is precisely to make up for the lack of public spaces, designed in a modern and linking them to sports, recreational and cultural activities of the whole country.
The ambition of the project is to provide the community with a sequence of events, through which we can enrich and grow socially, and recognize in a local identity that will lead to an entrenchment of emotions, feelings and behavior.
Actions planned for the redevelopment area are:
- at sport and recreation and cultural center "Bank of the Maremma"
- soccer field Description (size 30 mx 50 m)
Exams at the sports center "Bank of the Maremma"
Intervention will be provided at the top of the sports area, near the property boundary and in line with the skating rink. The building will be built in a rectangular plan with dimensions of 17 x 15 meters, thus developing a usable area of \u200b\u200b255 square meters for a plan of elevation, maximum 4.5 meters in height, as follows:
- a function room of about 180 square meters to serve the various cultural activities in the village or any initiative on the part of the population, such as birthdays, parties, and corporate dinners. The hall also will serve as a meeting place for young and old in the summer and assume the role of living for the festival of the country, with the help of tents set up by nell'intorno, can meet a requirement of the evening about 200 - 300.
- A kitchen with storage for about 45 square meters
- Toilets for disabled men and women about 30 square meters.
The Company provides for the development of the surrounding area with the placement of children's play sessions and planting of trees of native species.
The design of the building, in the implementation, follow the lines of the design of the cover to the ice rink (scheduled three-year plan of public works and added to the list of planned operations in the year 2010) by integrating with it in such a way as to create a continuity of public spaces open and built.
today in the area where the paved road ends, behind the short side of the field, it provides for the development of the area with the provision of a good car for the parking of cars, using non-waterproof material.
The size of the center is about 22,029 square meters and will include: a regular football field to eleven, a hard court tennis (disused) an ice rink (no longer used), two storage buildings, with changing rooms and secretariats (one closed), and a grandstand.
Today the real areas where the activities are carried out are limited, because these are only the main field and one of the buildings used for storage and changing rooms. All other areas were neglected because of their non-use.
is to be noted that the municipal administration of Grosseto has planned three-year plan of public works, added to the list of actions to be implemented in 2010, the execution of the roof of a skating rink for an amount of 300 000 Euro and maintenance changing rooms overlooking, thereby enabling the redevelopment of the area located west of the complex.
Proposed intervention
The need for action shared by the community
During the drafting of the Regulations of the Urban Municipality of Grosseto has been undertaken, by 'Administration, a phase of listening and participation of citizens in the villages. They gathered in their constituencies bring to light issues as individuals and in the proportion of the membership about the lack of space or lack of public green or sc Arsita infrastructure.
In Braccagni, specifically, among other issues emerged:
"A square : several years indicate that many citizens from a planning point of view one of the most important things to Braccagni missing is a reference center, a public meeting.
A square, a meeting place for young and old newspaper, a public space in which to develop social relationships. As such, the square should be a place surrounded by commercial and residential buildings, to become a real center of attraction and area representative of the community. "
" An area of \u200b\u200bgreen spaces: the far down is reported the need to create a garden or an area of \u200b\u200bpublic green facilities for the elderly and children. "
REPORT downloaded from the Grosseto:: FORUM BRACCAGNI and Montepescali December 17, 2008
The lack of quality standards and public gathering spaces in our cities, is due More and more social problems related to low relationship between individuals, the lack of communication, to sterility and lack of integration of social relationships.
In Braccagni as a major part, which has about 1482 inhabitants, the need to carve gathering places is as evident as necessary.
The only spaces for the community are the gardens inside the country and those close to the church, but do not create a true urban center of cultural exchange.
The philosophy of the proposed intervention is precisely to make up for the lack of public spaces, designed in a modern and linking them to sports, recreational and cultural activities of the whole country.
The ambition of the project is to provide the community with a sequence of events, through which we can enrich and grow socially, and recognize in a local identity that will lead to an entrenchment of emotions, feelings and behavior.
Operations under
Actions planned for the redevelopment area are:
- at sport and recreation and cultural center "Bank of the Maremma"
- soccer field Description (size 30 mx 50 m)
Exams at the sports center "Bank of the Maremma"
Intervention will be provided at the top of the sports area, near the property boundary and in line with the skating rink. The building will be built in a rectangular plan with dimensions of 17 x 15 meters, thus developing a usable area of \u200b\u200b255 square meters for a plan of elevation, maximum 4.5 meters in height, as follows:
- a function room of about 180 square meters to serve the various cultural activities in the village or any initiative on the part of the population, such as birthdays, parties, and corporate dinners. The hall also will serve as a meeting place for young and old in the summer and assume the role of living for the festival of the country, with the help of tents set up by nell'intorno, can meet a requirement of the evening about 200 - 300.
- A kitchen with storage for about 45 square meters
- Toilets for disabled men and women about 30 square meters.
The Company provides for the development of the surrounding area with the placement of children's play sessions and planting of trees of native species.
The design of the building, in the implementation, follow the lines of the design of the cover to the ice rink (scheduled three-year plan of public works and added to the list of planned operations in the year 2010) by integrating with it in such a way as to create a continuity of public spaces open and built.
today in the area where the paved road ends, behind the short side of the field, it provides for the development of the area with the provision of a good car for the parking of cars, using non-waterproof material.
Soccer field
At the rear of the stands can be a synthetic soccer field seven players the size of 30 m to 50 m.
This will serve both as a field for training of various teams of the company, allowing the best maintenance of the main field in grass, and as financial resources derived from renting the same, useful for creating that expendable micro credit for the costs of management of the entire system. Here, as the previous speaker along with the synthetic field will be placed around the area, with tree planting and the creation of chairs and benches in a "square" that will be built at the above, also useful as a meeting place.
As we understand, all the works and the proposed structures are contiguous, and, once implemented, will complement each other, increasing the potential value of sporting and social venue and at the meeting point of the country. Thus was born a true Braccagni a city of sport and leisure.
The completion of the forecasts will be made in the immediate time after time permits. The estimate of the intervention is around 200,000 euros, the amount will be provided with funding from the Bank of the Maremma, which is is already favorable view in the board of directors.
perspective views of interventions
|
| TABLE ONE delivered on July 21, 2010 with 92,780 Protocol |